Side Extension & Kitchen

Project No.JAN3013

Penge, London

Side Extension & Kitchen

 

Phase 1:

  • Site set up and planning
  • Isolation of gas, water and electrical supplies
  • Demolition and removal of existing conservatory
  • Removal of kitchen units, white goods and associated items
  • Demolition of partition wall between kitchen and dining room
  • Removal of exisitng soil pipe and associated drainage

 

Phase 2:

  • Excavations for new footings at 1.2m deep
  • Concreting to footings ensuring drainage has been shuttered
  • Hardcore to cover entire floor area and blinded with sand
  • Concrete pumped and levelled to form new base
  • Ventilation pipes installed within new concrete base
  • Removal of old split and bowed ceiling joists
  • Installation of new ceiling joists to entire kitchen and extension area
  • Installation of plasterboard to walls and ceilings
  • Floor screeding
  • Plastering